Ace Abseiling replaces failed window and joint sealant on strata and commercial buildings across Sydney by rope access. Old sealant is cut out, the joint is cleaned and prepared, and a new sealant suited to the joint movement and exposure is applied, so water stays out before it becomes a leak.
Our leak detection process is thorough and reliable.
Furthermore, we address every issue carefully — from window seals to structural joints, so your property stays protected long after the job is done.
Expert Leak Detection
Identifying the source of a leak can be challenging. However, our specialists find problems quickly and effectively. We perform water testing at the correct pressure to simulate heavy storms, so we can trace building leaks from wind-driven rain that a visual check would miss. Here is what happens in a façade water test.
From small water ingress to major seal failures, we handle each issue with precision and care.
High-Quality Caulking & Sealing
Whether you need window sealant replacement, a joint repaired or cracks in walls fixed, we have the right solution. Our caulking and sealing services use premium materials that deliver durability and long-lasting results.
How sealant replacement is done
Inspect the joints from rope access and photograph failed sealant, gaps and staining.
Cut out the old sealant completely, rather than sealing over it.
Clean and dry the joint faces, then fit backing rod and primer where the joint design calls for them.
Apply a sealant matched to the joint movement, the substrate and the exposure, and tool it to the correct profile.
Photograph the finished joints for the building file, and retest any detail that was leaking.
A joint masked on both sides before new sealant goes in, so the finished line is clean and straight.
Joints we reseal
Our caulking work in Sydney covers the joints that most often let water in on strata and commercial buildings. For window leaks, our guide to leaking window repair explains how the source is traced before resealing.
Window perimeters: heads, jambs and sills
Expansion and control joints in render, concrete and precast panels
Cladding and panel joints
Balcony, balustrade and slab-edge junctions
Penetrations and flashing junctions
Sealant replacement for strata and commercial buildings
Sealant replacement is one of the most common remedial jobs on Sydney apartment and office buildings, because exterior sealant ages faster than the materials either side of it. It is often done in the same rope access setup as building remedial works and façade repairs or a repaint, which saves a second mobilisation. The strata building maintenance calendar shows how sealant inspections fit with anchors, window cleaning and painting.
Signs the sealant is due for replacement
Sealant that has hardened, cracked, shrunk away from one side of the joint or gone chalky has stopped moving with the building. Read more in signs your window sealant needs replacing. If water is already getting in, start with high-rise leak detection so the repair targets the real entry point.
Customised Solutions for Every Job
Every project is different. That’s why we adjust our approach based on your specific needs. Our techniques range from soft pressure testing to replicating real-world weather conditions, so leaks are traced to their real source.
Recent sealing and caulking work
Joint sealing and caulking from recent ACE jobs. Old sealant is cut out before new sealant goes in, so the new joint bonds to clean surfaces.
Panel joints resealed by a two-person rope access team.Façade sealant replacement on a high-rise, with North Sydney behind.Window joint caulked from ropes.
Before / AfterWall joints in Bankstown, before and after resealing.
Old sealant removed before the joint is resealed.
Sealing an external lift shaft.
Window sealing on the Central Coast.
Window sealing in Parramatta
Window joints on a Parramatta building, masked and resealed on ropes.
Window joint resealed on ropes in Parramatta.
Joint masked and new caulking tooled off.
Sealing around a window at roof level.
IRATA Level 3Rope access work led by an IRATA Level 3 technician
A$20M public liabilityCertificates available on request
Sydney since 2021Strata, commercial and builder projects across Sydney
Get a Free Quote Today
If your property could benefit from our Sealing & Caulking, don’t hesitate to reach out to Ace Abseiling. We offer free quotes and flexible scheduling to accommodate your needs.
1. What type of sealant works best for exterior joints on a Sydney building?
Polyurethane and silicone-based sealants are common choices, selected based on joint movement, exposure, and the surrounding material. Ace Abseiling chooses the appropriate sealant type for each project across Sydney, matching product flexibility and UV resistance to the specific building conditions to maximise how long the seal lasts.
2. Is there value in doing preventative sealant maintenance rather than waiting for a leak to appear?
Absolutely. Preventative maintenance catches shrinking or cracking sealant before water actually gets through. Ace Abseiling offers scheduled sealant inspections for buildings across Sydney, replacing joints proactively so owners avoid the disruption and expense of chasing an active leak once internal damage has already occurred.
3. Who should I call when a high-rise building in Sydney has a persistent water leak?
Ace Abseiling specialises in tracing and fixing persistent water leaks on high-rise buildings across Sydney, using rope access to inspect and reseal problem areas directly on the facade. Rather than guessing at the source, technicians get right up to the joint, window, or crack causing the ongoing issue.
4. How do technicians find the source of a water leak on a high-rise building?
Technicians trace ingress points by inspecting sealant joints, window frames, and render cracks up close while suspended on ropes. Ace Abseiling investigates water leak sealing issues this way across Sydney, often finding that damage appearing inside a unit actually originates several floors higher on the facade.
5. How long does exterior sealant last?
It depends on the product, how much the joint moves and how exposed it is to sun and salt air, so there is no single answer. Sealant that has hardened, cracked, shrunk away from one side or gone chalky has reached the end of its life, and regular inspections catch this before water gets in.
6. Do you remove the old sealant or seal over it?
We cut out the old sealant completely. Sealing over failed sealant traps the problem and rarely bonds properly. The joint faces are cleaned and dried, backing rod and primer are fitted where the joint design calls for them, and the new sealant is tooled to the correct profile.
7. Can you water test the joints after resealing?
Yes. Where a joint or window was leaking, we can water test the area after the new sealant has cured to confirm the leak has stopped, and photograph the finished joints for the building file.
8. Can sealant be replaced on a high-rise building without scaffolding?
Yes. Rope access lets technicians reach window perimeters, expansion joints and panel joints on most elevations without scaffolding or an EWP. The roof anchors must be certified and in date first, and we can inspect and certify them as part of the same job.