- Pre-paint facade inspection and defect report for the committee
- Pressure cleaning to remove chalking paint, mould, salt, and pollutants
- Crack repair, render patching, and concrete spalling treatment
- Replacement of failed sealants around windows and expansion joints
- Two coats of premium acrylic or elastomeric membrane
- Colour consultation if the block is changing scheme
- Photographic before-and-after documentation for the AGM minutes
- Workmanship warranty in writing
For committees managing recurring facade and exterior works across the year, we also offer planned maintenance schedules tied to your 10-year capital works plan.
A facade repaint is the cheapest moment to address related defects. We routinely combine painting programs with commercial building maintenance tasks like anchor point recertification, window cleaning, and sealant replacement, so the building only mobilises a rope team once.
Strata managers running multiple blocks can also access our dedicated strata manager service for portfolio-wide planned maintenance.
Strata painting and repainting across Sydney
Most strata painting work is a full exterior repaint: walls, balconies, soffits and window surrounds, with render and concrete repairs carried out from the ropes before any paint goes on. Lobbies, corridors and stairwells are covered by our strata common area painting service, and façade-only jobs by building façade painting. For an example of a large strata repaint, see eight strata buildings painted in Dee Why. To plan a repaint alongside sealant, window cleaning and anchor inspections, use the strata building maintenance calendar.
How a strata repaint runs, from committee approval to handover
- Inspection and defect report: we inspect the façade, note cracks, spalling, failed sealant and coating condition, and photograph what the committee needs to see.
- Scope and specification: an itemised quote that names the elevations, preparation, repairs and coating system, with exclusions stated.
- Committee and owners decision: the strata manager tables the quote; a like-for-like repaint is normally an ordinary resolution, while a colour change usually needs a special resolution.
- Funding and timing: most repaints are funded from the capital works fund, so the program is timed around the 10-year plan and the weather.
- Resident notices: dates, elevations and balcony instructions issued before each stage.
- Works by elevation: wash, repair, seal, prime and paint, one elevation at a time, with exclusion zones below.
- Handover: a final inspection with the building manager, a before-and-after photo report and the warranty documents for the owners corporation.
Questions to ask before you sign? Read 10 questions committees should ask about a painting quote and how often a strata building should be repainted. Weighing up access methods? See rope access vs scaffolding for strata buildings. Working out a budget? See what drives the cost of rope access painting in Sydney.